Mtn Arrow Project
After this 370-ton summer home was moved 1/4 mile, a temporary cabinet and milling shop was set up on-site to handle all of the custom millwork and molding we generated. A 2,400 square-foot, three-story addition included an 800 square-foot kitchen and breakfast nook, spacious guest quarters and an elevator to service the main home. Replicated period moldings were used throughout the remodeling of the interior as well as exterior. (Photos do not show the kitchen addition since much of it is still under construction. Check back for more photos soon.) We insulated, re-wired, re-sided and installed a radiant heating system. Our client plans to turn one half of the basement into a pool and jacuzzi area and the other half into an in-home theatre. Stay tuned for more on this project!